File #: 21-0211    Version: 1 Name:
Type: CM Action Item - Open & Responsible Government Status: Passed
File created: 3/5/2021 In control: Board of Commissioners
On agenda: 3/17/2021 Final action: 3/17/2021
Title: Request approval to extend an existing contract - Department of Real Estate and Asset Management, SWC #99999-001-SPD0000154-0001, Facility Maintenance for Preventive Jail Maintenance Services at the South Fulton Municipal Regional Jail at Union City in the amount of $101,505.75 with CGL Facility Management, LLC (Fayetteville, GA), to provide continued preventive and corrective maintenance repair services at the South Fulton Municipal Jail at Union City for three (3) additional month period. Effective dates: April 1, 2021 through June 30, 2021. (APPROVED)
Attachments: 1. Exhibit 1 Extension No. 2 to Form of Contract- CGL, 2. Exhibit 2 Contractor's Performance Report, 3. Exhibit 3 SWC#99999-001-SPD0000154-0001, 4. Minutes - 2021-0211

 

Requested Action (Identify appropriate Action or Motion, purpose, cost, timeframe, etc.)

title

 

Request approval to extend an existing contract - Department of Real Estate and Asset Management, SWC #99999-001-SPD0000154-0001, Facility Maintenance for Preventive Jail Maintenance Services at the South Fulton Municipal Regional Jail at Union City in the amount of $101,505.75 with CGL Facility Management, LLC (Fayetteville, GA), to provide continued preventive and corrective maintenance repair services at the South Fulton Municipal Jail at Union City for three (3) additional month period.   Effective dates: April 1, 2021 through June 30, 2021. (APPROVED)

body

Requirement for Board Action (Cite specific Board policy, statute or code requirement)

In accordance with Purchasing Code Section 102-420, contract modifications within the scope of the contract & necessary for contract completion of the contract, in the specifications, services, time of performance or terms and conditions of the contract shall be forwarded to the Board of Commissioners for approval.

 

Strategic Priority Area related to this item (If yes, note strategic priority area below)

Open and Responsible Government

 

Commission Districts Affected

All Districts                     

District 1                     

District 2                     

District 3                     

District 4                     

District 5                     

District 6                     


Is this a purchasing item?

Yes

 

Summary & Background: This contract extension is being requested due to the pending award to a new vendor.  The extension provides ample time to select and recommend a new vendor for approval by the BOC.

 

Scope of Work:  

This contract provides for engineering management and technical expertise to maintain interior and exterior equipment and spaces, including, but not limited to: participate in strategic planning, budgeting sessions; evaluate infrastructure needs; energy management; provide an inventory of all equipment and systems, supervision, labor, materials, supplies, spare parts, tools, preventive and predictive maintenance and emergency services for the building and building systems in the facilities; assist Union City Jail staff and outside contractors and consultants hired by Fulton County for facility improvements, additions, upgrades, building retrofits and studies and monitor regulatory compliance for systems included in scope.

 

The Statewide Contractor (facility maintenance) will operate, maintain, monitor, and adjust the day-today operations of all mechanical, electrical, and building systems. The contractor shall be fully responsible for providing customer service, quality control and all other services.

 

Basic services shall include:

                     Facility Management: day-to-day management

                     Landscaping/Grounds

                     Electrical Systems but not limited to; high voltage distribution systems inclusive of transformers, switchgear, cables, and secondary conductors; all switchgear, main panel boards, subpanels, disconnects, motor starters and receptacles.

                     Kitchen Equipment: Preventive maintenance schedule for appliance repairs

                     Security Systems including but not limited to; audio systems, video systems, CCTV and cable TV

                     Emergency Generator Systems

                     Lighting: Preventive maintenance on all interior and exterior lighting attached to facility, security lighting, ballast, lighting control systems and lamp replacement. Exterior pole lighting is not responsibility of the Contractor.

                     Heating Ventilation and Air Conditioning Equipment including but not limited to; direct exchange cooling units, heat pumps, air handling units, roof tops, exhaust fans coils and refrigerant piping

                     Fire Alarm including but not limited to; fire suppression system, fire sprinklers, fire extinguishers and fire panels.

                     Fire Sprinkler Systems

                     Plumbing and Sewer including but not limited to; pipes, service pipes, drains, sumps, backflow prevention devices, sewage grinders, septic tanks, pumps, water heaters, sinks, showers, toilets, faucets, water purifiers, garbage disposals, washer lines, floor drains, and leak detection.

                     Building Utility Systems including but not limited to; chilled water, hot water, steam, and condensate, associated supply, return, and condensate pumps and controls, domestic hot water heat exchangers, chemical water treatment equipment, electrical, electronic, and pneumatic control systems, and compressed air systems.

                     Laundry Equipment: preventive maintenance schedule for all equipment as required by the manufacturer.

                     Pest Control

                     Natural Gas and LP Gas Distribution and Combustion Systems

 

 

Services not included:

                     Site Utilities

                     Janitorial Services

                     Roofing Services and Waterproofing Systems

                     Asphalt/Concrete Repair

                     Card Access System

                     IT Maintenance

 

However, if there is any interruption in the supply of any/all of the above utilities, the Contractor will coordinate with the respective utility vendors and ensure early resumption of utilities.

 

 

Community Impact: This ensures the facility improvements.

 

Department Recommendation: 

The Department of Real Estate and Asset Management requests approval to extend existing contract to provide continued preventive and corrective facility maintenance repair services at the South Fulton Municipal Jail at Union City for additional three (3) month time period effective; April 1, 2021 through June 30, 2021, to ensure continued preventive and corrective facility maintenance repair services for the South Fulton Jail until the new solicitation process is completed, BOC approvals and new contract documents are fully executed for fiscal year 2021

 

The existing statewide contract #99999-001-SPD0000154-0001 will expire on March 31, 2021.  For these reasons, we are requesting a 2nd extension for three (3) additional months term that will allow the County time to navigate through the following: to allow the new County Sherriff time to get acclimated with the County’s jail operations and staff and to conduct an physical assessment of the jail and equipment in order to provide any technical views/ or recommendation to the new RFP solicitation documents, develop a strategy to conduct an on-site facility tours to allow potential bidders/proposers which requires a mandatory physical on-site visits of both Fulton County Jail Complex and the South Fulton Municipal Regional Jail due to continue health crisis of COVID-19, 30 days solicitation process, evaluation/recommendation process, BOC award approval and the contract execution process.

 

This service will no longer be provided by the Statewide Contract, it’s being solicited as part of the RFP cost plus facility maintenance contract with the Fulton County Jail for FY2021.  We anticipate the new cost plus facility maintenance contract to begin July 1, 2021.

Historical Expenditures:

 

* FY2020: The County spent $713,226.78

* FY2019: The County spent $220,598.50

* FY2018: The County spent $150,000.00

 

Note: The Statewide Contract #90806 was approved by the BOC on 4/11/2018, as Item #18-0250 in the amount of $625,992 through 12/31/2018. The actual service begins in 10/1/2018

 

 

Project Implications: This extension will allow continued preventive and corrective maintenance repairs without disruption at this County facility until new Contract Agreement is established for FY2021.

 

Community Issues/Concerns: None that the Department is aware.

 

Department Issues/Concerns: If this contract extension is not approved, DREAM would not be able to provide continued preventive and corrective maintenance repairs at the South Fulton Jail. The Department does not have the internal resources necessary to render adequate and timely maintenance service to the South Fulton Jail.

 

Contract Modification 

 

Current Contract History

BOC Item

Date

Dollar Amount

Original Award Amount

19-1023

12/4/19

$625,992.00

Increase Spending Authority

20-0757

10/16/20

$132,856.05

Extension No. 1

20-0872

12/2/20

$101,505.75

Extension No. 2

 

 

  $101,505.75

Total Revised Amount

 

 

$961,859.55

 

Contract & Compliance Information (Provide Contractor and Subcontractor details.)

Click or tap here to enter text.

 

Exhibits Attached 

Exhibit 1:  Extension No. 2 to Form of Contract

Exhibit 2.  Contractor’s Performance Report

Exhibit 3   SWC99999-001-SPD0000154-0001

 

Contact Information (Type Name, Title, Agency and Phone)
title

Joseph N. Davis, Director, Department of Real Estate and Asset Management, (404) 612-3772

 

Contract Attached
title

Yes


Previous Contracts

title

Yes

 

Total Contract Value

Original Approved Amount:

$625,992.00

Previous Adjustments:

$234,361.80

This Request:

$101,505.75

TOTAL:

$961,859.55


Grant Information Summary

Amount Requested:

 

Cash

Match Required:

 

In-Kind

Start Date:

 

Approval to Award

End Date:

 

Apply & Accept

Match Account $:

 

 

 


Fiscal Impact / Funding Source

Funding Line 1:

100-520-5224-1116: General, Real Estate and Asset Management, Building Maintenance- $101,505.75

Key Contract Terms

Start Date: 4/1/2021

End Date: 6/30/2021

Cost Adjustment

Renewal/Extension Terms


Overall Contractor Performance Rating:

Would you select/recommend this vendor again?

Yes

 

Report Period Start:

Report Period End:

4/1/2021

6/30/2021