Legislation Details

File #: 26-0806    Version: 1 Name:
Type: CM Action Item - Open & Responsible Government Status: Passed
File created: 9/28/2026 In control: Board of Commissioners
On agenda: 12/2/2026 Final action: 11/18/2026
Title: Request approval of Task Order 1 – Department of Real Estate and Asset Management, 23RFP138733K-BKJ, Standby Professional Services for Facilities Related Planning, Design, Engineering and Assessments – Architectural and Engineering Services, in an amount not to exceed $549,841.00 with (D) WSP USA Environment & Infrastructure, Inc. (Kennesaw, GA), to provide Due Diligence Services for the Fulton County Jail Capital Improvement Program at the Fulton County Jail Complex, 901 Rice Street, Atlanta, GA 30318. Effective upon BOC approval. (APPROVED)
Attachments: 1. Exhibit 1_WSP Task Order To Form .pdf, 2. Exhibit 2 - Cost Proposal, 3. Exhibit 3 Evaluation Performance Report - AE - WSP

 

Department

Real Estate and Asset Management

 

Requested Action

title

 

Request approval of Task Order 1 - Department of Real Estate and Asset Management, 23RFP138733K-BKJ, Standby Professional Services for Facilities Related Planning, Design, Engineering and Assessments - Architectural and Engineering Services, in an amount not to exceed $549,841.00 with (D) WSP USA Environment & Infrastructure, Inc. (Kennesaw, GA), to provide Due Diligence Services for the Fulton County Jail Capital Improvement Program at the Fulton County Jail Complex, 901 Rice Street, Atlanta, GA 30318. Effective upon BOC approval.  (APPROVED)

body


Requirement for Board Action

In accordance with Purchasing Code Section 102-360, request for approval of Task Orders exceeding $500,000 shall be forwarded to the Board of Commissioners for approval.

 

Strategic Priority Area related to this item

Open and Responsible Government

 

Commission Districts Affected

All Districts

X

District 1

 

District 2

 

District 3

 

District 4

 

District 5

 

District 6

 


Is this a purchasing item?

Yes

 

Summary & Background: On April 24, the BOC approved Item #24-0242, 23RFP138733K-BKJ (D) Standby Professional Services for Facilities Related Planning, Design, Engineering, and Assessments-Architectural and Engineering Services. The goal of this task order is to provide Due Diligence Services at the Fulton County Jail Complex for the Fulton County Jail Capital Improvement Program, which include, Environmental, Geotechnical, Surveying, and Subsurface Services for the project area within the Fulton County Jail Parcel ID: 14 0113 LL0121 in Atlanta, GA.

 

The Fulton County Jail Capital Improvement Program includes demolition of existing facilities, utility infrastructure improvements, site redevelopment, and construction of new detention facilities, administration, support, and ancillary facilities by others at the Fulton County Jail Complex located at 901 Rice Street NW, Atlanta, Georgia. The site area encompasses approximately 32.9 acres of the overall property. Fulton County DREAM site redevelopment efforts will include the demolition of existing structures to allow for the construction of an approximately 780,000 square feet (SF) multi-story detention facility with 1,800 beds, a second two-story separate housing facility of approximately 120,000 SF with 500 beds, and a separate central utility plant to serve these proposed new facilities as well as the existing Rice Street Jail. WSP understands that Fulton County has one or more active procurement processes to select the designers and construction managers for these redevelopment efforts.

 

Scope of Work: To furnish all the standby professional architectural and engineering management services, related planning, contract administration, all detailed design services to provide support for the Fulton County Jail Capital Improvement Program, Due Diligence Services being performed at the full Rice Street Campus, Atlanta, GA. 

 

Due Diligence Services deliverables shall consist of, but not limited to:

 

TASK A1: Initiation, Kickoff Meeting, and Existing Information Gathering

•                     Documentation defining areas anticipated for borings, test pits, utility locating efforts, environmental sampling, and survey limits.

•                     Documented meeting minutes

•                     A request for information (RFI) log as required for further clarifications once materials are reviewed by each discipline.

•                     A preliminary findings report with desktop studies and information gathered including a summarized description.

 

TASK A2: Design-Level Topographic Survey, and Preliminary Utility Surveys

•                     Signed and sealed Design-Level Topographic and Existing-Conditions Survey in PDF and native AutoCAD, including survey control and datum information, collected point data, feature coding, break lines, and an editable digital terrain surface, with applicable survey data incorporated into the master GIS.

•                     Site Reconnaissance Memorandum and Photographic Documentation.

•                     Preliminary Existing Infrastructure and Utility Inventory.

•                     Preliminary Existing Conditions and Utility Mapping.

•                     Utility Source and Data-Confidence Matrix.

 

TASK A3: Geotechnical Exploration

•                     A brief review of our test procedures and the results of the field and laboratory tests.

•                     Review and inclusion of provided historic geotechnical data.

•                     A plan illustrating the approximate field test locations.

•                     Borings logs describing conditions encountered at individual locations.

•                     A discussion of area and site geological conditions based upon available information.

•                     A discussion of subsurface soil and rock stratigraphy.

•                     An estimate of depth of groundwater table, if encountered, and preliminary discussion on potential groundwater impacts. (Task 4)

•                     Discussion of existing subsurface conditions as they relate to property development.

•                     A discussion of surface features and site conditions encountered that could affect development, such as shallow rock or groundwater.

•                     An evaluation of the acceptability of encountered soil for re-use as structural fill/backfill material (if applicable).

•                     Discussion of difficult excavation conditions that could be encountered.

•                     Preliminary seismic site class based on N-value correlations.

•                     Discussion of other issues raised by the exploration and general discussion of additional exploration and possible analysis needed as part of a final design level exploration.

 

TASK A4: Phase I Environmental Site Assessment (ESA)

•                     Draft Phase I ESA Report

•                     Final Phase I ESA Report

 

TASK A5: Geographical Information Systems (GIS) & Final Standby #1 Reporting

•                     Final reports from Tasks A1-A4.

•                     Master GIS database incorporating Standby #1 data from Tasks A1 through A4 above.

•                     GIS data dictionary identifying layer names, field descriptions, source references, confidence classifications, and intended use/limitations.

•                     GIS layer index or inventory summarizing included datasets, source task, source date,

•                     responsible discipline, and applicable limitations.

•                     Electronic GIS deliverable package, expected to include an editable geodatabase or County approved equivalent format, layer files/symbology where applicable, metadata, and supporting documentation.

 

TASK B1: Functional Servicing and Utilities Report

•                     Documentation defining existing utility routings within the limits of the topographic and SUE survey performed in Task A2

•                     Draft and Final Functional Servicing and Utilities Report with summary of findings including planning-level potable water, sewer, gas, and fire-protection demands.

 

TASK B2: Limited Phase II Environmental Site Assessment (ESA)

 

•                     Produce a Limited Phase II ESA report as the deliverable. The report will include: Site Background, Methods, Figure(s), Analytical Results, Data Validation, Discussion of Findings, Source Attribution, and Conclusions which state clearly if any RECs identified during the Phase I ESA have been confirmed to have contamination above standards.

•                     Present or discuss the findings with the Client following report completion.

 

 

Community Impact: Accomplishing this Task Order supports the Fulton County Capital Improvement Program and will impact the community by providing: a) Modernized Fulton County Jaily Infrastructure by replacing aging jail structures at or near the existing Jail facility and b) Enhanced Service Delivery by integrating comprehensive administrative, support, and central utility spaces to ensure safer, more efficient operations for staff, detainees, and the surrounding Fulton County community. 

 

Department Recommendation: The Department of Real Estate and Asset Management recommends approval. 

 

The project management is coordinated effort by the Department of Real Estate and Asset Management Building Construction Management Team, the Jail Facility Management Team, and the Program Management Team.

 

Project Implications: This Task Order will provide essential site due diligence, including environmental, geotechnical, surveying, and subsurface assessments-across 32.9 acres to guarantee structural and regulatory viability before construction begins. 

 

Community Issues/Concerns: The County performs all due diligence to ensure that future structures are structurally sound and safe for County operations, occupancy and public use.

 

Department Issues/Concerns: If this task order is not approved, there will be a delay in the County performing all due diligence required to ensure that future structures are structurally sound and safe for County operations, occupancy and public use in association with Fulton County Jail Improvement Program. 

 

Contract Modification

(D) WSP USA Environment & Infrastructure, Inc.

 

Current Contract History

BOC Item

Date

Dollar Amount

Original Award Amount

24-0242

4/10/24

$400,000.00

1st Renewal

24-0681

10/16/24

$400,000.00

2nd Renewal

25-0697

9/17/25

$400,000.00

Task Order #1

 

 

$549,841.00

Total Revised Amount

 

 

$1,749,841.00

Contract & Compliance Information (Provide Contractor and Subcontractor details.)

Contract Value:                                          $549,841.00  

(D)

Prime Vendor:                     WSP USA Environment & Infrastructure, Inc                     

Prime Status:                     Non-Minority

Location:                                                               Kennesaw, GA                                                               

County:                                                               Cobb County

Prime Value:                                          $412,380.75 or 75.00%                      

 

Subcontractor:                     Hammond & Associates, Inc.                     

Subcontractor Status:                     African American Male Business Enterprise

Location:                                                               Norcross, GA                                          

County:                                                               Gwinnett County

Subcontractor Value:                     $137,460.25 or 25.00%

 

Total Contract Value:                     $549,841.00 or 100.00%

Total Certified Value:                     $137,460.25 or 25.00%

 

Exhibits Attached

Exhibit 1: Task Order No. 1 to Form of Contract

Exhibit 2: Cost Proposal

Exhibit 3: Evaluation Performance Report

 

Contact Information
title

Joseph N. Davis, Director, Department of Real Estate and Asset Management, (404) 612-3772

 

Contract Attached
title

Yes


Previous Contracts

title

Yes

 

Total Contract Value

Original Approved Amount:

$400,000.00

Previous Adjustments:

$800,000.00

This Request:

$549,841.00

TOTAL:

$1,749,841.00


Grant Information Summary

Amount Requested:

Click here to enter text.

 

Cash

Match Required:

Click here to enter text.

 

In-Kind

Start Date:

Click here to enter text.

 

Approval to Award

End Date:

Click here to enter text.

 

Apply & Accept

Match Account $:

Click here to enter text.

 

 


Fiscal Impact / Funding Source

Funding Line 1:

9999-542-520-5200-J008-J008-BFAC-542DSG; Jail Construction Fund, DREAM, Public Buildings, Site Due Diligence, Bond Financed - Facilities, Design/Engineering - $549,841

Funding Line 2:

Key Contract Terms

Start Date: Upon BOC Approval

End Date: Upon issuance of NTP for a duration of 20 weeks or project completion as determined by the County

Cost Adjustment: Yes

Renewal/Extension Terms: N/A


Overall Contractor Performance Rating: 85

Would you select/recommend this vendor again?

Yes

 

Report Period Start:

Report Period End:

7/20/2026

8/9/2026