Department
Real Estate and Asset Management
Requested Action (Identify appropriate Action or Motion, purpose, cost, timeframe, etc.)
title
Request approval to increase the spending authority - Department of Real Estate and Asset Management, 21ITB1302418C-CG, Standby Plumbing Repair Services in the total amount not to exceed $46,328.00, with (A) Liquid Services & Logistic, LLC (Atlanta, GA) in an amount not to exceed $34,500.00, to provide replacement and installation of approximately 50 ft. of cast iron pipe on a sewer line and cut open for the removal of concrete and replace up to an approximately 10 ft. section of sewer line, and then install all new pipe and fittings at the DA Pearson facility; and (B) J2 Connect, Inc. dba J Squared Plumbing Co., Inc. (McDonough, GA) in an amount not to exceed $11,828.00, to provide repair to a broken 4-inch line and repair PVC to a cast iron transition, and concrete removal/replacement of 6 ft. area and final clean-up at the HJC Bowden Senior Multipurpose Center. Effective upon BOC approval. (APPROVED)
body
Requirement for Board Action (Cite specific Board policy, statute or code requirement)
In accordance with Purchasing Code Section 102-420, contract modifications within the scope of the contract and necessary for contract completion of the contract, in the specifications, services, time of performance or terms and conditions of the contract shall be forwarded to the Board of Commissioners for approval.
Strategic Priority Area related to this item (If yes, note strategic priority area below)
Open and Responsible Government
Commission Districts Affected
All Districts ☒
District 1 ☐
District 2 ☐
District 3 ☐
District 4 ☐
District 5 ☐
District 6 ☐
Is this a purchasing item?
Yes
Summary & Background This request to increase spending authorities is to cover the costs of required plumbing repair/replacement jobs at two (2) Fulton County facilities: DA Pearson facility and the HJC Bowden Senior Multipurpose Center.
Scope of Work:
Repair/Replacement Plumbing System Jobs:
(A) Liquid Services Logistic, LLC formally Talon Property Services, LLC:
|
County Facility |
Project Description |
Project Cost |
1 |
DA Pearson facility |
Replace and install 50 ft of cast iron pipe and cut open and remove concrete to install all new 3-inch PVC pipe and fittings. |
$24,000.00 |
2 |
DA Pearson facility |
Cut open for the removal of concrete and replace up to approximately 10 ft. section of sewer line, and then install all new pipe and fittings. |
$10,500.00 |
|
Total Project Costs |
$34,500.00 |
(B) J2 Connect, Inc.
|
County Facility |
Project Description |
Project Cost |
1 |
HJC Bowden Senior Multipurpose Center |
To provide repair to a broken 4-inch line and repair PVC to a cast iron transition, to include costs for concreate removal/ replacement of 6 ft. area and final clean-up |
$11,828.00 |
|
Total Project Costs |
$11,828.00 |
These contracts furnish all materials, labor, tools, equipment, and parts necessary to provide on-site standby plumbing repair services on an “as needed” basis for Fulton County facilities.
The Scope of Work includes but not limited to:
1. Repairing/replacing and installing water mains, water lines, re-routing water supply lines, storm water and sewer lines, manholes, grating, and retention basins.
2. Installing, repairing, and replacing fixtures such as faucets, mixing valves, toilets, urinals, tubs, sinks, kitchen sinks, ball valves, angle/straight stops, pressure-reducing valves, and any commercial plumbing fixture such as floor sinks, dishwashers, any specialty kitchen/bathroom.
3. Installing and repairing water heaters, sump pumps, circulation pumps and plumbing for icemakers. Installation and adjustment of drinking water fountains, repairing irrigation sprinkler systems, and minor masonry repair jobs caused by plumbing work.
Community Impact: These services are necessary for environmental health and to have working plumbing systems to protect the patrons and employees in County facilities.
Department Recommendation: The Department of Real Estate and Asset Management recommends approval.
DREAM does not have enough remaining spending authority ($43,158.00) to cover these high priority plumbing jobs and to maintain and operate routine maintenance/repair of plumbing system throughout the County for the reminder of FY2023. The requested increase in the total amount of $46,328.00 is critical and will allow the two Standby Plumbing Contractors to provide the immediate plumbing repair/replacement jobs at these two identified County facilities.
The project management for plumbing repair/replacement jobs is coordinated by the Department of Real Estate and Asset Management Building Maintenance Team of Greater Fulton.
Project Implications: These services are necessary for environmental health and to have working plumbing systems to protect the patrons and employees in County facilities.
Community Issues/Concerns: None of which the Department is aware.
Department Issues/Concerns: If these increases in spending authorities are not approved, there will be a delay in addressing plumbing repair/replacement work in a timely or cost-effective manner.
Modification
(A) Liquid Services & Logistic, LLC formally Talon Property Services, LLC
Current Contract History |
BOC Item |
Date |
Dollar Amount |
Original Award Amount |
21-0874 |
11/3/21 |
$90,000.00 |
Increase Spending Authority No. 1 |
22-0826 |
11/2/22 |
$50,000.00 |
1st Renewal |
22-0732 |
10/5/22 |
$90,000.00 |
Increase Spending Authority No. 2 |
|
|
$34,500.00 |
Total Revised Amount |
|
|
$264,500.00 |
(B) J2 Connect, Inc. dba J Squared Plumbing Co., Inc.
Current Contract History |
BOC Item |
Date |
Dollar Amount |
Original Award Amount |
21-0874 |
11/3/21 |
$90,000.00 |
Increase Spending Authority No. 1 |
22-0826 |
11/2/22 |
$85,000.00 |
1st Renewal |
22-0732 |
10/5/22 |
$100,000.00 |
Increase Spending Authority No. 2 |
|
|
$11,828.00 |
Total Revised Amount |
|
|
$286,828.00 |
Contract & Compliance Information (Provide Contractor and Subcontractor details.)
Total Contract Value: $46,328.00
(A)
Contract Value: $34,500.00
Prime Vendor: Liquid Services & Logistic, LLC formally Talon Property Services, LLC
Prime Status: Non-Minority
Location: Atlanta, GA
County: Fulton County
Prime Value: $31,050.00 or 90.00%
Subcontractor: To Be Determined
Subcontractor Value: $3,450.00 or 10.00%
Total Contract Value: $34,500.00 or 100.00%
Total Certified Value: $0.00 or 0.00%
(B)
Contract Value: $11,828.00
Prime Vendor: J2 Connect, Inc. aka J Squared Plumbing Co. Inc.
Prime Status: African American Male Business Enterprise
Location: McDonough, GA
County: Henry County
Prime Value: $11,828.00 or 100.00%
Total Contract Value: $11,828.00 or 100.00%
Total Certified Value: $11,828.00 or 100.00%
Grand Contract Value: $46,328.00 or 100.00%
Grand Certified Value: $11,828.00 or 25.53%
Exhibits Attached (Provide copies of originals, number exhibits consecutively, and label all exhibits in the upper right corner.)
Exhibit 1: Amendment No. 2 to Form of Contracts
Exhibit 2: Cost Proposals
Exhibit 3: Contractor’s Performance Reports
Contact Information (Type Name, Title, Agency and Phone)
title
Joseph N. Davis, Director, Department of Real Estate and Asset Management, (404) 612-3772
Contract Attached
title
Yes
Previous Contracts
title
Yes
Total Contract Value
Original Approved Amount: |
$180,000.00 |
Previous Adjustments: |
$325,000.00 |
This Request: |
$46,328.00 |
TOTAL: |
$551,328.00 |
Grant Information Summary
Amount Requested: |
|
☐ |
Cash |
Match Required: |
|
☐ |
In-Kind |
Start Date: |
|
☐ |
Approval to Award |
End Date: |
|
☐ |
Apply & Accept |
Match Account $: |
|
|
|
Fiscal Impact / Funding Source
Funding Line 1:
100-520-5221-1116: General, Real Estate and Asset Management, Building Maintenance - $ 46,328.00
Key Contract Terms |
Start Date: Upon BOC Approval |
End Date: 12/31/2023 |
Cost Adjustment: |
Renewal/Extension Terms: N/A |
Overall Contractor Performance Rating:
Liquid Services & Logistic, LLC formally Talon Property 88
J2 Connect, Inc. aka J Squared Plumbing Co. Inc. 88
Would you select/recommend this vendor again?
Yes
Report Period Start: |
Report Period End: |
4/1/2023 |
6/30/2023 |