Legislation Details

File #: 26-0667    Version: 1 Name:
Type: CM Action Item - Open & Responsible Government Status: Passed
File created: 8/7/2026 In control: Board of Commissioners
On agenda: 10/7/2026 Final action: 10/7/2026
Title: Request approval to increase spending authority - Department of Real Estate and Asset Management, Bid #24ITB0617C-MH, Standby Plumbing Repair Services Countywide in the total amount not to exceed $80,000.00, with (A) J2 Connect, Inc. (McDonough, GA), to cover the costs for a high priority plumbing replacement/repair job due to a damaged sewer line in the kitchen at the HJC Bowden Senior Multipurpose Center located at 2885 Church Street, East Point, GA 30344. Effective upon BOC approval. (APPROVED)
Attachments: 1. Exhibit 1 Amendment No. 1 to Form of Contract- J2 Connect, 2. Exhibit 2 Contractor's Performance Report- J2, 3. Exhibit 3 Cost Proposal - J2 Plumbing Repairs at HJC Bowden

 

Department

Real Estate and Asset Management

 

Requested Action

title

 

Request approval to increase spending authority - Department of Real Estate and Asset Management, Bid #24ITB0617C-MH, Standby Plumbing Repair Services Countywide in the total amount not to exceed $80,000.00, with (A) J2 Connect, Inc. (McDonough, GA), to cover the costs for a high priority plumbing replacement/repair job due to a damaged sewer line in the kitchen at the HJC Bowden Senior Multipurpose Center located at 2885 Church Street, East Point, GA 30344. Effective upon BOC approval.  (APPROVED)

 

body

Requirement for Board Action

In accordance with Purchasing Code Section 102-420, contract modifications within the scope of the contract and necessary for contract completion of the contract, in the specifications, services, time of performance or terms and conditions of the contract shall be forwarded to the Board of Commissioners for approval.

 

Strategic Priority Area related to this item

Open and Responsible Government

 

Commission Districts Affected

All Districts

x

District 1

 

District 2

 

District 3

 

District 4

 

District 5

 

District 6

 


Is this a purchasing item?

Yes

 

Summary & Background The requested spending authority of $80,000.00 will allow DREAM to replace/repair of approximately 120 feet of deteriorated 4-inch sanitary sewer piping with new PVC, including excavation, installation, and site restoration at the HJC Bowden Senior Center. This increase in spending will ensure the continuing continuity of kitchen operations.

 

Scope of Work: This contract furnishes all materials, labor, tools, equipment, and parts necessary to provide on-site standby plumbing repair services on an “as needed” basis for Fulton County facilities.

 

The Scope of Work includes but not limited to:

 

1.                     Repairing/replacing and installing water mains, water lines, re-routing water supply lines, storm water and sewer lines, manholes, grating, and retention basins.

2.                     Installing, repairing, and replacing fixtures such as faucets, mixing valves, toilets, urinals, tubs, sinks, kitchen sinks, ball valves, angle/straight stops, pressure-reducing valves, and any commercial plumbing fixture such as floor sinks, dishwashers, any specialty kitchen/bathroom.

3.                     Installing and repairing water heaters, sump pumps, circulation pumps and plumbing for icemakers. Installation and adjustment of drinking water fountains, repairing sprinkler systems, and minor masonry repair jobs caused by plumbing work.

 

Community Impact: Properly functioning sanitary lines are critical in ensuring the environmental health and safety of facility patrons and County staff. 

 

Department Recommendation: The Department of Real Estate and Asset Management recommends approval.

 

Project Implications: This contract requires specialty tools, equipment, training, and skills that the County’s in-house staff do not have. Without this spending authority increase, the necessary plumbing repair services will not be performed in a timely or cost-effective manner. 

 

Community Issues/Concerns: None that the Department is aware.

 

Department Issues/Concerns: If this increase in spending is not approved, there will be a delay in addressing plumbing replacement/repair work at the HJC Bowden Senior Center.

 

Contract Modification

 

(A)                     J2 Connect, Inc.

 

Current Contract History

BOC Item

Date

Dollar Amount

Original Award Amount

25-0203

3/19/25

$150,000.00

1st Renewal

25-0701

9/17/25

$150,000.00

Increase Spending Authority No. 1

 

 

$80,000.00

Total Revised Amount

 

 

$380,000.00

 

Contract & Compliance Information

Contract Value:                                                               $80,000.00

 

Prime Vendor:                                                              J2 Connect, Inc. dba J Squared Plumbing Co., Inc.

Prime Status:                                                              African American Male Business Enterprise

Location:                                                                                   McDonough, GA

County:                                                                               Henry County

Prime Value:                                                               $80,000.00 or 100.00%

 

Total Contract Value:                                           $80,000.00 or 100.00%

Total Certified Value:                                         $80,000.00 or 100.00 %                     

 

Exhibits Attached

Exhibit 1: Amendment No. 1 to Form of Contract

Exhibit 2: Contractor’s Performance Report

Exhibit 3  Cost Proposal

 

Contact Information
title

Joseph N. Davis, Director, Department of Real Estate and Asset Management, (404) 612-3772

 

Contract Attached
title

Yes


Previous Contracts

title

Yes

 

Total Contract Value

Original Approved Amount:

$150,000.00

Previous Adjustments:

$150,000.00

This Request:

$80,000.00

TOTAL:

$380,000.00



Fiscal Impact / Funding Source

Funding Line 1:

100-520-5220-1116: General, Real Estate and Asset Management, Building Maintenance - $80,000.00

 

Key Contract Terms

Start Date: Upon BOC Approval

End Date: 12/31/2026

Cost Adjustment: 

Renewal/Extension Terms: N/A


Overall Contractor Performance Rating: 79

Would you select/recommend this vendor again?

Yes

 

Report Period Start:

Report Period End:

4/1/2026

6/30/2026