Title: Request approval to increase the spending authority - Department of Real Estate and Asset Management, 22ITB135741C-GS, Fire Sprinkler Protection System Maintenance Services in an amount not to exceed $36,877.00 with VSC Fire & Security, Inc. (Norcross, GA), to provide additional modification and extensions to the existing fire sprinkler system due to re-configuration of spaces on the 1st (Notary and Passport Offices) and 5th (Criminal Division Offices) floors of the Fulton County Lewis Slaton Courthouse located at 136 Pryor Street, Atlanta, GA 30303. Effective upon BOC approval. (APPROVED)
Attachments: 1. Exhibit 1 Amendment No. 1 to Form of Contract- VSC Fire, 2. Exhibit 2 Contractor's Performance Report - Fire Sprinkler VSC

 

Department

Real Estate and Asset Management

 

Requested Action (Identify appropriate Action or Motion, purpose, cost, timeframe, etc.)

title

 

Request approval to increase the spending authority - Department of Real Estate and Asset Management, 22ITB135741C-GS, Fire Sprinkler Protection System Maintenance Services in an amount not to exceed $36,877.00 with VSC Fire & Security, Inc. (Norcross, GA), to provide additional modification and extensions to the existing fire sprinkler system due to re-configuration of spaces on the 1st (Notary and Passport Offices) and 5th (Criminal Division Offices) floors of the Fulton County Lewis Slaton Courthouse located at 136 Pryor Street, Atlanta, GA 30303. Effective upon BOC approval.  (APPROVED)

body

 

Requirement for Board Action (Cite specific Board policy, statute or code requirement)

In accordance with Purchasing Code Section 102-420, contract modifications within the scope of the contract and necessary for contract completion of the contract, in the specifications, services, time of performance or terms and conditions of the contract shall be forwarded to the Board of Commissioners for approval.

 

Strategic Priority Area related to this item (If yes, note strategic priority area below)

Open and Responsible Government

 

Commission Districts Affected

All Districts                     

District 1                     

District 2                     

District 3                     

District 4                     

District 5                     

District 6                     


Is this a purchasing item?

Yes

 

Summary & Background To provide for the modification and extensions to the existing fire sprinkler system resulting from re-configuration of spaces on the 1st (Notary and Passport Offices) and 5th (Criminal Division Offices) floors of the Fulton County Lewis Slaton Courthouse. This action will allow this building to be in compliance with NFPA 25 Code (National Fire Protection Association).

 

Scope of Work: This request for increase in spending authority is expected to cover the costs for the additional modification and extensions to the existing fire sprinkler systems  made necessary to conform to the requirements of NFPA 25 due to the re-configuration of spaces on the 1st (Notary and Passport Offices) and 5th (Criminal Division Offices) floors of the Fulton County Lewis Slaton Courthouse.

 

Replacement Project Costs:

 

Building/Location

Project Description

Project Cost

1

                                                                     Fulton County Notary & Passport Offices, 1st floor of the Lewis Slaton Courthouse

Provide and install two (2) system sensor devices, one (1) wall mount speaker strobe in the Corridor behind front desk, and one (1) wall mount strobe only in back-office hallway.

$2,045.00

2

 

Provide design and install materials to modify the existing Wet Sprinkler System coverage in accordance with NFPA 13, 2019 edition.

$21,991.00

3

    Fulton County Criminal Division Offices, 5th floor of the Lewis Slaton Courthouse

Provide and install two (2) new System Sensor Ceiling Mount Strobe only devices, and demo & relocate one (1) System Sensor Speaker Strobe in the Corridor outside office.

$3,145.00

4

 

Provide design and install materials to modify the existing Wet Sprinkler System in accordance with NFPA 13, 2019 edition. 

$9,696.00

5

Project Total Cost

$36,877.00

 

This contract furnishes all materials, parts, labor, equipment, and appurtenances necessary to provide quarterly flow tests and verification of associated alarms; one annual inspection; testing and maintenance of sprinkler, fire pumps and hydrants; post tag at each Fire Department connection and system control valve; and inspection and testing for Fulton County facilities.

 

The Scope of Work also include copies of State of Georgia Certificate (Georgia Department of Insurance and Fire Safety requires technicians/Inspectors to have NICET Level III Certification in Inspection and Testing of Water-Based Systems) or other acceptable forms of certification acceptable to the area having jurisdiction (City, State, etc.) to prove that they are qualified to perform maintenance on fire protection systems, including fire pumps and dry systems.

 

Community Impact: If this modification is not approved, we will not be able to replace the existing fire alarms in a timely manner. This contract focuses on the safety of the buildings which are visited by citizens. This contract covers the annual maintenance and inspection of the fire sprinkler protection system in the buildings for any deficiency that may be observed that would put the building out of compliance. In addition, any corrective repairs that need to be conducted to maintain the systems in operation and ensure compliance with fire codes are provided under this contract.

 

Department Recommendation: The Department of Real Estate and Asset Management recommends approval. 

 

The increased spending authority will allow DREAM to complete the necessary installation and have sufficient spending authority for the remainder of FY2024 to cover quarterly flow tests and verification of associated alarms, one annual inspection, and testing and maintenance of sprinkler, fire pumps and hydrants Countywide.

 

The project management is coordinated by the DREAM Building Maintenance Team/Building Construction Division and in collaboration with the Offices of Superior ad Magistrate Court.

 

Project Implications: These are activities mandated by the State Fire Marshal. Non-compliance also could result in potential life-safety risks for employees and visitors to Fulton County facilities

 

Community Issues/Concerns: None of which the Department is aware.

 

Department Issues/Concerns: If this increase spending authority is not approved, there will be a delay in completing an ongoing renovation project as the renovation scope of work requires the referenced modifications and extensions in order for the affected area to be compliant with current fire code. 

 

Contract Modification

 

Current Contract History

BOC Item

Date

Dollar Amount

Original Award Amount

23-0092

2/1/23

$200,000.00

1st Renewal

23-0715

10/18/23

$215,000.00

Increase Spending Authority No. 1

 

 

$36,877.00

Total Revised Amount

 

 

$451,877.00

Contract & Compliance Information (Provide Contractor and Subcontractor details.)

Contract Value:                                          $36,877.00

Prime Vendor:                     VSC Fire & Security, Inc.

Prime Status:                     Non-Minority

Location:                                                               Norcross, GA

County:                                                               Gwinnett County

Prime Value:                                          $36,877.00 or 100.00%

 

Total Contract Value:                     $36,877.00 or 100.00%

Total Certified Value:                     $0.00 or 0.00%

 

Exhibits Attached (Provide copies of originals, number exhibits consecutively, and label all exhibits in the upper right corner.)

Exhibit 1:  Amendment No. 1 to Form of Contract

Exhibit 2:  Performance Evaluation

 

Contact Information (Type Name, Title, Agency and Phone)
title

Joseph N. Davis, Director, Department of Real Estate and Asset Management, (404) 612-3772

 

Contract Attached
title

Yes

Previous Contracts
title

Yes

 

Total Contract Value

Original Approved Amount:

$200,000.00

Previous Adjustments:

$215,000.00

This Request:

$36,877.00

TOTAL:

$451,877.00


Grant Information Summary

Amount Requested:

 

Cash

Match Required:

 

In-Kind

Start Date:

 

Approval to Award

End Date:

 

Apply & Accept

Match Account $:

 

 

 


Fiscal Impact / Funding Source

Funding Line 1:

100-520-5221-1116: General, Real Estate and Asset Management, Building Maintenance- $36,877.00

 

Key Contract Terms

Start Date: Effective upon BOC approval

End Date: 12/31/2024

Cost Adjustment

Renewal/Extension Terms: N/A


Overall Contractor Performance Rating: 100

Would you select/recommend this vendor again?

Yes

 

Report Period Start:

Report Period End:

2/1/2023

7/31/2023