File #: 25-0032    Version: 1 Name:
Type: CM Action Item - Health and Human Services Status: Passed
File created: 12/3/2024 In control: Board of Commissioners
On agenda: 1/8/2025 Final action: 1/8/2025
Title: Request approval of extend an existing contract - Public Works Department, 22ITB136410K-BKJ, Pine Valley Phase 2A Interceptor Sewer Replacement at no additional cost for extension of "time only" with Wade Coots Company, Inc (Austell, GA) to provide all labor, material and equipment to remove and replace approximately 4,062 feet of 30" to 48" RCP gravity sewer pipe with 54" HOBAS fiberglass pipe and epoxy coated precast concrete manholes. Effective upon Boc approval through March 31, 2025. (APPROVED)
Attachments: 1. Exhibit 1: Amendment to Contract, 2. Exhibit 2: Performance Evaluation

 

Department

Public Works

 

Requested Action (Identify appropriate Action or Motion, purpose, cost, timeframe, etc.)

title

 

Request approval of extend an existing contract - Public Works Department, 22ITB136410K-BKJ, Pine Valley Phase 2A Interceptor Sewer Replacement at no additional cost for extension of “time only” with Wade Coots Company, Inc (Austell, GA) to provide all labor, material and equipment to remove and replace approximately 4,062 feet of 30” to 48” RCP gravity sewer pipe with 54” HOBAS fiberglass pipe and epoxy coated precast concrete manholes. Effective upon Boc approval through March 31, 2025. (APPROVED)

body


Requirement for Board Action
(Cite specific Board policy, statute or code requirement)

In accordance with Purchasing Code Section 102-420, contract modifications within the scope of the contract and necessary for contract completion of the contract, in the specifications, services, time of performance or terms and conditions of the contract shall be forwarded to the Board of Commissioners for approval.

 

Strategic Priority Area related to this item (If yes, note strategic priority area below)

Health and Human Services

 

Commission Districts Affected

All Districts                     

District 1                     

District 2                     

District 3                     

District 4                     

District 5                     

District 6                     


Is this a purchasing item?

Yes

 

Summary & Background: The Department of Public Works requests approval to extend “time only” with Wade Coots Company, Inc. (Austell, GA) to provide construction Management services for the Pine Valley Sewer Replacement Phase 2A project.

 

Scope of Work: The Pine Valley Sewer Replacement Phase 2A project involves supplying all necessary labor, equipment, and materials for installing 4,062 linear feet of 54-inch Hobas sanitary sewer pipe.

The original contract approved by the Board of Commissioners on May 3, 2023 (Agenda #23-0313) had a completion date of July 16, 2024. However, design modifications were required as a result of unforeseen site conditions, which included rock and concrete structures encountered in the field. The new completion date will be March 31, 2025.

Community Impact: The Pine Valley Sewer Replacement Phase 2A project will increase the capacity of the sewer lines for future flows allowing the community to grow and prevent sanitary sewer spills due to old defective pipes.

 

Department Recommendation: The Department of Public Works recommends approval to extend time only to the existing contract.

 

Project Implications: Without the repair and replacement of the sewer lines, they may fail and cause major spills that will detrimentally impact the environment.

 

Community Issues/Concerns: No concerns have been raised to Public Works staff.

 

Department Issues/Concerns: Public Works does not have any concerns or issues.

 

Contract Modification:

 

Current Contract History

BOC Item

Date

Dollar Amount

Original Award Amount

23-0313

05/03/2023

$7,536,975.00

Amendment #1

102-364

07/17/2024

$750,000.00

Amendment #2

 

 

$.00

Total Revised Amount

 

 

$8,286,975.00

Contract & Compliance Information (Provide Contractor and Subcontractor details.)

Contract Value:                                          $Time Extension

 

 

Prime Vendor:                                          Wade Coots Company, Inc.

Prime Status:                                          Non-Minority

Location:                                                               Austell, GA

County:                                                               Cobb County

Prime Value:                                          $00.00

 

Subcontractor:                                          D &G Boring, Inc.

Subcontractor Status:                     Non-Minority

Location:                                                               Smyrna, GA

County:                                                               Cobb County

Contract Value:                                           $00.00

 

Subcontractor:                                          UWS, Inc.

Subcontractor Status:                     Non-Minority

Location:                                                               Trion, GA

County:                                                               Chattooga County

Contract Value:                                           $00.00

 

Subcontractor:                                           Lori’s Transportation 

Subcontractor Status:                     African American Male Business Enterprise

Location:                                                                Alpharetta, GA 

County:                                                                Fulton County

Contract Value:                                          $00.00

 

Subcontractor:                                           T & J Industries 

Subcontractor Status:                      African American Male Business Enterprise

Location:                                                                Stonecrest, GA 

County:                                                                DeKalb County

Contract Value:                                          $00.00

 

Total Contract Value:                      $Time Extension

Total Certified Value:                      $Time Extension

 

 

Exhibits Attached (Provide copies of originals, number exhibits consecutively, and label all exhibits in the upper right corner.)

Exhibit 1: Amendment to Contract

Exhibit 2: Performance Evaluation

 

Contact Information (Type Name, Title, Agency and Phone)
title

Roy Barnes, Deputy Director, Public Works 404-612-6317

 

Contract Attached
title

Yes


Previous Contracts

title

Yes

 

Total Contract Value

Original Approved Amount:

$7,536,975.00

Previous Adjustments:

$750,000.00

This Request:

$0.00

TOTAL:

$8,286,975.00


Grant Information Summary

Amount Requested:

 

Cash

Match Required:

 

In-Kind

Start Date:

 

Approval to Award

End Date:

 

Apply & Accept

Match Account $:

 

 

 


Fiscal Impact / Funding Source

Funding Line 1:

203-540-5400-S165: Water & Sewer R & E, Public Works, Misc. Sewer Line Project

 

 

 

 

 

 

 

Key Contract Terms

Start Date: 10/15/2024

End Date: 3/31/2025

Cost Adjustment:

Renewal/Extension Terms: No Renewal Option


Overall Contractor Performance Rating: 94

Would you select/recommend this vendor again?

Yes

 

Report Period Start:

Report Period End:

2/22/2024

5/21/2024