File #: 25-0337    Version: 1 Name:
Type: Consent - Health and Human Services Status: Agenda Ready
File created: 2/26/2025 In control: Board of Commissioners
On agenda: 5/7/2025 Final action:
Title: Request approval of a change order less than 10% - Public Works, 23RFP052223K-JA, Design-Build Services for Camp Creek Water Reclamation Facility in an amount not to exceed $300,000.00 with Reeves Young, LLC (ATL, Ga.) to address concrete deficiencies that were discovered within the primary clarifiers once the tanks were emptied. These defects were significantly more deteriorated than initially anticipated. Effective upon BOC approval.
Attachments: 1. Exhibit 1: CHANGE ORDER #1 Form to Contract, 2. Exhibit 2: Performance Evaluation BidNet CPR_Construction_Reeves Young, 3. PCO 001 - Blower Isolation Valves, 4. PCO 003 Slide Gates - Local Control Switch, 5. PCO 008 - PC 3130 Concrete Floor Repair, 6. PCO 009 - PC 3120 Concrete Floor Repair
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

 

Department

Public Works

 

Requested Action (Identify appropriate Action or Motion, purpose, cost, timeframe, etc.)

title

 

Request approval of a change order less than 10% - Public Works, 23RFP052223K-JA, Design-Build Services for Camp Creek Water Reclamation Facility in an amount not to exceed $300,000.00 with Reeves Young, LLC (ATL, Ga.) to address concrete deficiencies that were discovered within the primary clarifiers once the tanks were emptied. These defects were significantly more deteriorated than initially anticipated. Effective upon BOC approval.

body


Requirement for Board Action
(Cite specific Board policy, statute or code requirement)

In accordance with Purchasing Code Section 102-420, contract modifications within the scope of the contract and necessary for contract completion of the contract, in the specifications, services, time of performance or terms and conditions of the contract shall be forwarded to the Board of Commissioners for approval.

 

Strategic Priority Area related to this item (If yes, note strategic priority area below)

Health and Human Services

 

Commission Districts Affected

All Districts                     

District 1                     

District 2                     

District 3                     

District 4                     

District 5                     

District 6                     


Is this a purchasing item?

Yes

 

Summary & Background: This is an immediate needs project focusing on the primary and secondary clarifiers of the Camp Creek WRF North Plant and its associated jet blower system. The North Plant of Camp Creek has three (3) primary and three (3) secondary clarifiers that have reached the end of their useful design lives. This project will replace the mechanical components of those facilities and repair any concrete deficiencies that are noted in the drained tankage. Camp Creek is a biological plant that depends on the performance of microorganisms to properly treat wastewater. The project’s rehabilitation and replacement efforts will extend the useful life of the plant’s treatment process. 


During construction, it was observed that the concrete conditions in primary clarifiers #3120 and #3130 were significantly more deteriorated than initially anticipated. Additionally, it was identified that operations and maintenance personnel must climb a ladder over active basins to access and operate the UV influent sluice gates, posing a major safety concern.  Furthermore, four (4) blower isolation valves along the main header pipe were found to be in severe disrepair, necessitating immediate replacement to ensure future operational reliability.

 

Scope of Work:
The proposed work under this change order will cover 5 items as listed below:
(1) Replacement of the 4 blower isolation valves in the amount of $8,921.70
(2)  installation of three (3) local controls for the UV influent sluice gates in the amount   of $14,511.85
(3) repair of 7,088 sqft. of concrete within primary clarifier 3120 in the amount of $127,582.88
(4) repair of 7,088 sqft. of concrete within primary clarifier 3130 in the amount of $127,582.88
(5) replenish owners directed cost in the amount of $21,400.69.  

 

Community Impact: The proposed action will not directly affect the community that is served by this facility.

 

Department Recommendation: The Public Works Department recommends approval of this item.

 

Project Implications: Approval of this item will allow the immediate needs project to address some issues that were uncovered after the start of construction. It will also allow the final product to better align with the safety protocols as desired by the operations/maintenance staff. 

 

Community Issues/Concerns: No community issues or concerns have been noted by the Public Works Department.

 

Department Issues/Concerns: The Public Works Department requires approval of this item to adequately address the deteriorating concrete in the two primary clarifiers and to enhance the plant's safety and operational efficiency. This includes installing local sluice gate controls for improved accessibility and replacing the failed blower isolation valves to ensure reliable system functionality.

 

Contract Modification

 

Current Contract History

BOC Item

Date

Dollar Amount

Original Award Amount

23-0825

11/15/2023

$9,725,000.00

Change Order No. 1

 

 

$300,000.00

Total Revised Amount

 

 

$10,025,000.00

Contract & Compliance Information (Provide Contractor and Subcontractor details.)

Contract Value:                                          $300,000.00 

 

Prime Vendor:                                          Reeves Young

Primes Status:                                   Non-Minority

Location:                                                               Atlanta, GA

County:                                                               Fulton County  

Prime Value:                                          $44,835.00 or 14.95%

 

Subcontractor:                                          Airco, LLC

Subcontractor Status:                     Non-Minority

Location:                                                               Newnam, GA

County:                                                               Coweta County

Subcontractor Value:                     $255,165.00 or 85.055%

 

Total Contract Value:                     $300,000.00 or 100.00%

Total Certified Value:                     $00.00 or 0.00%

 

Exhibits Attached

Exhibit 1: Change Order Agreement

Exhibit 2:  Performance Evaluation

 

Contact Information tle

David E. Clark, Director, Public Works 404-612-2804

 

Contract Attached
title

Yes


Previous Contracts

title

Yes

 

Total Contract Value

Original Approved Amount:

$9,725,000.00

Previous Adjustments:

$0.00

This Request:

$300,000.00

TOTAL:

$10,025,000.00


Grant Information Summary

Amount Requested:

 

Cash

Match Required:

 

In-Kind

Start Date:

 

Approval to Award

End Date:

 

Apply & Accept

Match Account $:

 

 

 


Fiscal Impact / Funding Source

Funding Line 1:

203-540-5400-I052: Water & Sewer RE, Public Works, Camp Creek 35 MGD,

Key Contract Terms

Start Date: 2/14/2024

End Date: 1/14/2026

Cost Adjustment: $300,000.00

Renewal/Extension Terms


Overall Contractor Performance Rating: 76

 

Would you select/recommend this vendor again?

Yes

 

Report Period Start:

Report Period End:

10/1/2024

12/31/2024