Department
Real Estate and Asset Management
Requested Action
title
Request approval to utilize cooperative purchasing - Department of Real Estate and Asset Management, Sourcewell Contract RFP #080420, Elevator, Escalators, and Moving Walks with Related Equipment, Services, and Supplies, in the total amount not to exceed $1,700,000.00 with Thyssenkrupp Elevator (Marietta, GA), to remove and dispose existing escalators and install two (2) new Velino Escalators in the Fulton County Government Center located at 141 Pryor Street Atlanta, GA 30303, in the amount not to exceed $848,000.00 and to remove and dispose existing escalators and install two (2) new Velino Escalators in the Fulton County Justice Center located at 185 Central Ave SW, Atlanta, GA 30303, in the amount not to exceed $852,000.00. The Schedule of Work commences upon issuance of the Notice to Proceed through 340 calendar days, with the contract ending upon completion of replacement/installation project as determined by Fulton County.
body
Requirement for Board Action
In accordance with Purchasing Code Section 102-462, requests for approval to utilize cooperative purchasing or GSA purchase contracts of more than $100,000 shall be forwarded to the Board of Commissioners for approval.
Strategic Priority Area related to this item (If yes, note strategic priority area below)
Open and Responsible Government
Commission Districts Affected
All Districts ☒
District 1 ☐
District 2 ☐
District 3 ☐
District 4 ☐
District 5 ☐
District 6 ☐
Is this a purchasing item?
Yes
Summary & Background: This cooperative purchasing contract furnishes all materials, labor, tools, equipment, and appurtenances necessary for the replacement and installation of new escalators in the Fulton County Government and Justice Center Complexes.
1. Government Center Complex (GCC)
The escalators in the Government Center were installed during original construction and have exceeded their useful life expectancy. In July 2021, the Safety Inspector from the Georgia Office of Commissioner of Insurance and Safety Fire ordered the shutdown of both the UP and DOWN escalators citing safety concerns. The escalators cannot be repaired as parts are no longer available for purchase due to the age of the system.
2. Justice Center Tower (JCT)
Existing escalators in the Justice Center Tower are 20+ years old and have exceeded their useful life expectancy. The “Up” escalator unit is currently offline due to a damaged drive motor. A replacement motor is no longer available due to the system’s age. The “Dowm” escalator was taken offline in 2024 due to the need for replacement step chains and handrails. Given the age of the unit, it is more financially prudent to replace versus repair.
Scope of Work: . The scope of work includes, but is not limited to, the following:
Removal Existing Escalators:
Ø Provide demolition and removal of existing escalators in both GCC and JCT
Ø Provide cranes and rigging necessary to complete removal in both GCC and JCT
Installation of New Escalators:
Ø Install two (2) new TKE Velino Escalators Upper End and Lower End in the GCC
Ø Install two (2) new TKE Velino Escalators Upper End and Lower End in the JCT
Related Build Work:
Ø Furnish and install barricades around both sides of bottom escalator. approx. 55' x 20'
Ø Furnish and install barricades 20' x 6' at top of escalator.
Ø Furnish and install floor protection top and bottom of escalator Demo out sheetrock below escalator and reframe sheetrock when job is complete.
Ø Paint ceiling area where sheetrock was demoed.
Ø Demo sprinklers for removal of escalators Reinstall sprinklers when new escalators are installed.
Ø Demo four (4) can lights for removal of escalator.
Ø Reinstall four (4) can lights when job is complete.
Ø Demo out tile on walls and reinstall tile on walls around escalator.
Ø When job is completed demo tile floor around top landing of escalator approx. 5' x 15' x 5'
Ø Furnish and install glass piece on top side of escalator between escalator and wall floor protection at door entrance 3/4 plywood approx. 5' x 15'
Ø Paint barricades building choice of color.
Note: All work to be performed during normal business hours (8am to 5pm, M-F, non-holidays)
Community Impact: This project will promote ease of travel for staff and citizens throughout the affected facilities.
Department Recommendation: The Department of Real Estate and Asset Management recommends approval.
The project will be managed by the Department Real Estate and Asset Management (DREAM), Central Fulton Maintenance team.
The estimated time to complete the required replacement/installation is 16 months upon receipt of notice to proceed/or completion of project as determined by Fulton County and purchase order with lead time of materials and equipment.
Project Implications: This contract will allow the necessary modernizations/upgrade of the existing escalators to more reliable and safe equipment systems for both GCC and JCT.
Community Issues/Concerns: None that the Department is aware.
Department Issues/Concerns: If utilization of this cooperative purchasing contract is not approved, the County will not be able to provide an immediate comprehensive replacement and installation of new escalators in the Fulton County’s Government Center or Justice Center.
Contract Modification: This is a new request.
Contract & Compliance Information (Provide Contractor and Subcontractor details.)
Click or tap here to enter text.
Exhibits Attached (Provide copies of originals, number exhibits consecutively, and label all exhibits in the upper right corner.)
Exhibit 1: Sourcewell Contract RFP #080420-TKE
Exhibit 2: Cost Proposals
Exhibit 3: Performance Evaluation
Contact Information (Type Name, Title, Agency and Phone)
title
Joseph N. Davis, Director, Department of Real Estate and Asset Management, (404) 612-3772
Contract Attached
title
Yes
Previous Contracts
title
Yes
Total Contract Value
Original Approved Amount: |
$0.00 |
Previous Adjustments: |
$0.00 |
This Request: |
$1,700,000.00 |
TOTAL: |
$1,700,000.00 |
Grant Information Summary
Amount Requested: |
|
☐ |
Cash |
Match Required: |
|
☐ |
In-Kind |
Start Date: |
|
☐ |
Approval to Award |
End Date: |
|
☐ |
Apply & Accept |
Match Account $: |
|
|
|
Fiscal Impact / Funding Source
Funding Line 1:
500-520-5200-ACGE 500EQM Major Program EQUIP Govt Ctr Escalator- $848,000.00
Funding Line 2:
500-520-5200-ACJE 500EQM, Major Program EQUIP Justice Tower Escalator- $852,000.00
Key Contract Terms |
Start Date: Upon BOC Approval |
End Date: Effective upon issuance of Notice to Proceed through completion of replacement/installation project as determined by Fulton County. |
Cost Adjustment: |
Renewal/Extension Terms: |
Overall Contractor Performance Rating: 3.6
Would you select/recommend this vendor again?
Yes
Report Period Start: |
Report Period End: |
1/1/2010 |
3/23/2010 |