Legislation Details

File #: 26-0322    Version: 1 Name:
Type: CM Action Item - Health and Human Services Status: Passed
File created: 4/23/2026 In control: Board of Commissioners
On agenda: 6/3/2026 Final action: 6/3/2026
Title: Request approval of the lowest responsible bidder - Public Works Department, 26ITB030926K-DB, Taxiway Geometry Improvements Project in an amount not to exceed $1,314,153.87, with S.H. Creel Contracting, LLC, (Powder Springs, GA.) to provide shoulder grading and stormwater drainage improvements; erosions control measures; asphalt pavement construction, bituminous milling for tie-ins, pavement markings, and installation of Taxiway Edge Lighting at the Fulton County Executive Airport. The Contractor shall commence the Work within 10 days from receipt of Notice to Proceed ("NTP") from the County and shall finally complete the work within thirty calendar (30) days of issuance of the NTP. (APPROVED)
Attachments: 1. Exhibit 1: Recommendation Memo, 2. Exhibit 2: Bid Tabulation Sheet, 3. Exhibit 3: New Vendor Memo

DEPARTMENT
Public Works

REQUESTED ACTION (Identify appropriate Action or Motion, purpose, cost, timeframe, etc.)
title

Request approval of the lowest responsible bidder - Public Works Department, 26ITB030926K-DB, Taxiway Geometry Improvements Project in an amount not to exceed $1,314,153.87, with S.H. Creel Contracting, LLC, (Powder Springs, GA.) to provide shoulder grading and stormwater drainage improvements; erosions control measures; asphalt pavement construction, bituminous milling for tie-ins, pavement markings, and installation of Taxiway Edge Lighting at the Fulton County Executive Airport. The Contractor shall commence the Work within 10 days from receipt of Notice to Proceed ("NTP") from the County and shall finally complete the work within thirty calendar (30) days of issuance of the NTP. (APPROVED)
body

REQUIREMENT FOR BOARD ACTION (Cite specific Board policy, statute or code requirement)
In accordance with Purchasing Code Section 102-373, all competitive sealed bids of more than $100,000 shall be forwarded to the Board of Commissioners for approval.
STRATEGIC PRIORITY AREA RELATED TO THIS ITEM (If yes, note strategic priority area below)
Infrastructure and Economic Development

COMMISSION DISTRICTS AFFECTED
All Districts ?
District 1 ?
District 2 ?
District 3 ?
District 4 ?
District 5 ?
District 6 ?

IS THIS A PURCHASING ITEM?
Yes

SUMMARY & BACKGROUND: The project generally consists of the construction of a geometric improvements along Taxiway "I" from the Northeast ramp utilized by tenants of the Fulton County Executive Airport, including Hill Aircraft, Koch, Enterprise Aviation, and Coca-Cola.

Scope of Work: The project generally consists of the construction of a geometric improvements along Taxiway "I" from the Northeast ramp utilized by tenants of the Fulton County Executive Airport, including Hill Aircraft, Koch, Enterprise Aviation, These improvements are tailored to the design standards of Group II aircraft. The project will include ...

Click here for full text